91人妻人人澡人人爽人人精品|日韩激情综合啪啪|日本不卡影院一级小黄片试看|青青草成人免费播放视频|俄罗斯三级黄色免费网站|又黄又大又长成人影片在线观看|超碰人妻AV欧美无修正|亚洲第一簧片草久久久久久久|无码成人影视亚洲激动视频|国一精品免费区色色色亚洲

OA
CN

Danger elimination and reinforcement project of key (II) reservoir in Duchang County

Danger elimination and reinforcement project of key (II) res...
Danger elimination and reinforcement project of key (II) reservoir in Duchang County,the total construction period is 165 days and the total investment is 2814399.28 Yuan.

The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city

The Renovation project from Binjiang hotel to Guantang secti...
The Renovation project from Binjiang hotel to Guantang section of Guanyang Town, Guanyang County, Guilin city is located in the urban area of Guanyang County, with a total construction period of 30 days and a total investment of 18132288 Yuan.

Small Hydropower station in Anhua County, Hunan Province

Small Hydropower station in Anhua County, Hunan Province
Small Hydropower station in Anhua County, Hunan Province.

High standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011

High standard farmland construction demonstration project of...
The total construction period of high standard farmland construction demonstration project of agricultural comprehensive development in Nanchang County in 2011 is 120 days and the total investment is 3675699.44 Yuan.

Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project

Yichun Shanggao County in 2011, 40 small reservoirs reinforc...
Yichun Shanggao County in 2011, 40 small reservoirs reinforcement project, with a total investment of 4144142.57 Yuan.

Longtan Hydropower Station in Guangxi Province

Longtan Hydropower Station in Guangxi Province
As the "West-to-East Power Tansmission" landmark project and the key project of the western development,Longtan Hydropower Station is the second largest hydropower station in China following the Three Gorgers Hydropower Station. The design water level is 400 meters, the dam height is 216.5 meters, the dam crest length is 836 meters, the storage capacity is 27.3 billion cubic meters, the installed capacity is 6.3 million kilowatts, and the annual power generation capacity is 18.7 billion kilowatt-hours.
目前在第1頁(yè), 共有1頁(yè), 共有6條記錄 第一頁(yè) 上一頁(yè) 1 下一頁(yè) 最后一頁(yè) 跳轉(zhuǎn)到頁(yè)